Amsterdam ArenA indications contract for new hybrid system
six months after installing a hybrid pitch, Amsterdam ArenA will continue their cooperation with FieldTurf Benelux by selecting Camiseta Atletico Madrid ‘PlayMaster’, the new Lay & Play system by Tarkett Sports. FieldTurf Benelux will set up the hybrid surface, de Enk Groen & Golf will be accountable for the maintenance as well as monitoring.
Since July 2016, Amsterdam ArenA has been teaming up with FieldTurf Benelux for the utilize of hybrid turf. This successful cooperation will now be prolonged by installing PlayMaster for the upcoming season.
The new hybrid Lay & Play system ensures an ideal balance between natural as well as artificial grass as well as ensures a quick installation Camiseta Selección de fútbol de Serbia as well as immediate playability. After growing the hybrid grass sods at expert turf farms, the ready-to-play turf rolls will be installed in the stadium.
Amsterdam ArenA as well as FieldTurf Benelux joined forces to choose de Enk Groen & Golf for the maintenance of the pitch. After each game, the technical personnel of AFC Ajax will provide comments on the high quality of the field to the maintenance team. With this comments the team can control the maintenance plan in order to provide the greatest possible quality.
Environmental measures are likewise high on the program of the included parties. The aim is to Camiseta Barcelona reduce the utilize of fossil fuels to zero, in addition to cut the usage of raw materials by half over the next few years. For this, irrigation water will be reused. The condition of the turf will always be the top priority.
With PlayMaster, AFC Ajax will have a perfect pitch throughout the season.
Image, courtesy: FieldTurf / Tarkett Sports
#SportsVenueBusiness
Share This Article